{"id":11888,"date":"2021-06-24T17:49:19","date_gmt":"2021-06-24T15:49:19","guid":{"rendered":"https:\/\/marineforum.online\/?p=11888"},"modified":"2021-06-24T17:53:27","modified_gmt":"2021-06-24T15:53:27","slug":"fleet-service-boats-the-navys-flash-order","status":"publish","type":"post","link":"https:\/\/marineforum.online\/en\/flottendienstboote-die-blitzbestellung-der-marine\/","title":{"rendered":"Fleet service boats: the navy's flash order"},"content":{"rendered":"<p>No sooner had the Defence and Budget Committees decided on the extensive procurement of defence equipment for the navy yesterday (Wednesday) than the first contract was signed. As announced by the Federal Office of Bundeswehr Equipment, Information Technology and In-Service Support, the L\u00fcrssen shipyard has been commissioned to design and build three Class 424 fleet service boats. In addition, a training and reference facility for this system is to be built.<br \/>\nLike the existing fleet service boats, the new Class 423 units will be designed according to civilian standards. This should save costs and development time. The planners envisage the new ships entering service for the first time as early as 2027. <span style=\"font-variant: small-caps;\">Alster, Oker<\/span> and <span style=\"font-variant: small-caps;\">Oste<\/span> take place seamlessly. The ships in service today were commissioned in 1988 and 1989 and would have been in service for the navy for almost four decades at the time of the changeover.<br \/>\nThe requirements for the surface and underwater reconnaissance components are a challenge in the design of the new boats. Added to this are self-protection, command and control capabilities and the desired use of a particularly low-noise drive.<\/p>\n<p><em>Text: mb; Drawing: L\u00fcrssen<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Kaum hatten Verteidigungs- und Haushaltsausschuss am gestrigen Mittwoch eine umfangreiche Beschaffung von Wehrmaterial f\u00fcr die Marine beschlossen, wurde auch schon der erste Vertrag unterzeichnet. Wie das zust\u00e4ndige Bundesamt f\u00fcr Ausr\u00fcstung, Informationstechnik und Nutzung der Bundeswehr mitteilte, wurde die L\u00fcrssen Werft mit dem Entwurf und Bau von drei Flottendienstbooten der Klasse 424 beauftragt. Dar\u00fcber hinaus soll [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":11887,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_oasis_is_in_workflow":0,"_oasis_original":0,"_oasis_task_priority":"","footnotes":""},"categories":[49,486,42,52],"tags":[1387,344],"class_list":["post-11888","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-schiffsbau-news","category-headlines","category-news","category-technologie-news","tag-flottendienstboot","tag-luerssen"],"acf":[],"_links":{"self":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/11888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/comments?post=11888"}],"version-history":[{"count":0,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/11888\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/media\/11887"}],"wp:attachment":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/media?parent=11888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/categories?post=11888"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/tags?post=11888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}