{"id":17754,"date":"2022-03-15T13:45:11","date_gmt":"2022-03-15T12:45:11","guid":{"rendered":"https:\/\/marineforum.online\/?p=17754"},"modified":"2022-03-15T19:08:40","modified_gmt":"2022-03-15T18:08:40","slug":"last-corvette-laid-up-on-keel","status":"publish","type":"post","link":"https:\/\/marineforum.online\/en\/letzte-korvette-auf-kiel-gelegt\/","title":{"rendered":"Last corvette laid down"},"content":{"rendered":"<p><strong>With today's keel laying, platform production of the last of a total of five new Class 130 corvettes for the German Navy is in full swing. <\/strong><\/p>\n<figure id=\"attachment_17785\" aria-describedby=\"caption-attachment-17785\" style=\"width: 265px\" class=\"wp-caption alignleft\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-17785\" src=\"\/wp-content\/uploads\/2022\/03\/Kiellegung-K130-Boot-10-FKpt-Kenneth-Harms_-Kommandeur-des-1.-Korvettengeschwaders.--200x300.jpg\" alt=\"\" width=\"265\" height=\"398\" srcset=\"\/wp-content\/uploads\/2022\/03\/Kiellegung-K130-Boot-10-FKpt-Kenneth-Harms_-Kommandeur-des-1.-Korvettengeschwaders.--200x300.jpg 200w, \/wp-content\/uploads\/2022\/03\/Kiellegung-K130-Boot-10-FKpt-Kenneth-Harms_-Kommandeur-des-1.-Korvettengeschwaders.--683x1024.jpg 683w, \/wp-content\/uploads\/2022\/03\/Kiellegung-K130-Boot-10-FKpt-Kenneth-Harms_-Kommandeur-des-1.-Korvettengeschwaders.--768x1152.jpg 768w, \/wp-content\/uploads\/2022\/03\/Kiellegung-K130-Boot-10-FKpt-Kenneth-Harms_-Kommandeur-des-1.-Korvettengeschwaders.--1024x1536.jpg 1024w, \/wp-content\/uploads\/2022\/03\/Kiellegung-K130-Boot-10-FKpt-Kenneth-Harms_-Kommandeur-des-1.-Korvettengeschwaders.--1080x1620.jpg 1080w, \/wp-content\/uploads\/2022\/03\/Kiellegung-K130-Boot-10-FKpt-Kenneth-Harms_-Kommandeur-des-1.-Korvettengeschwaders.--360x540.jpg 360w, \/wp-content\/uploads\/2022\/03\/Kiellegung-K130-Boot-10-FKpt-Kenneth-Harms_-Kommandeur-des-1.-Korvettengeschwaders.--750x1125.jpg 750w, \/wp-content\/uploads\/2022\/03\/Kiellegung-K130-Boot-10-FKpt-Kenneth-Harms_-Kommandeur-des-1.-Korvettengeschwaders.--1140x1710.jpg 1140w, \/wp-content\/uploads\/2022\/03\/Kiellegung-K130-Boot-10-FKpt-Kenneth-Harms_-Kommandeur-des-1.-Korvettengeschwaders.-.jpg 1280w\" sizes=\"(max-width: 265px) 100vw, 265px\" \/><figcaption id=\"caption-attachment-17785\" class=\"wp-caption-text\"><em>Keel laying K130 Boat 10 FKpt Kenneth Harms_ Commander of the 1st Corvette Squadron<\/em>.<\/figcaption><\/figure>\n<p>Due to the pandemic, the ceremonial keel laying took place at the Peene shipyard in the smallest possible project circle in the presence of representatives of the client and the sponsor city. The new corvettes are being built at several shipyards in northern Germany under the leadership of the NVL Group (formerly: L\u00fcrssen Defence).<\/p>\n<p>At the same time as the keel is being laid at the NVL site in Wolgast, the final forecastle is being built at the GERMAN NAVAL YARDS shipyard in Kiel. The forecastle and stern are then transported to the Blohm+Voss NVL site in Hamburg for joining. The approximately 89 metre long corvettes will also be commissioned in Hamburg, from where they will undergo functional checks and acceptance tests in coordination with the specialist departments of the public client and the German Navy.<\/p>\n<p>Boats 6, 7 and 8 are currently in various stages of final outfitting, while boat 9 is in the production phase.<\/p>\n<p>The construction contract awarded by the Federal Office of Bundeswehr Equipment, Information Technology and In-Service Support (BAAINBw) on 12 September 2017 comprises five additional Class 130 corvettes. The first five units have been in service since 2008.<\/p>\n<p>Boats 6-10 will be delivered by the K130 consortium (ARGE), consisting of the lead company NVL Group, thyssenkrupp Marine Systems and GERMAN NAVAL YARDS KIEL. In addition to design services, production, integration of all systems, equipment and installations, the contract also includes the design of the shore and training facilities. Comprehensive logistics and services are also included, such as technical documentation and training the future crew members in the use of the equipment.<\/p>\n<figure id=\"attachment_17763\" aria-describedby=\"caption-attachment-17763\" style=\"width: 300px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-medium wp-image-17763\" src=\"\/wp-content\/uploads\/2022\/03\/20220209-_Schiffe-Angres-7_web-1-300x200.jpg\" alt=\"Photos. D. Angres\" width=\"300\" height=\"200\" srcset=\"\/wp-content\/uploads\/2022\/03\/20220209-_Schiffe-Angres-7_web-1-300x200.jpg 300w, \/wp-content\/uploads\/2022\/03\/20220209-_Schiffe-Angres-7_web-1-1024x683.jpg 1024w, \/wp-content\/uploads\/2022\/03\/20220209-_Schiffe-Angres-7_web-1-768x512.jpg 768w, \/wp-content\/uploads\/2022\/03\/20220209-_Schiffe-Angres-7_web-1-1080x720.jpg 1080w, \/wp-content\/uploads\/2022\/03\/20220209-_Schiffe-Angres-7_web-1-750x500.jpg 750w, \/wp-content\/uploads\/2022\/03\/20220209-_Schiffe-Angres-7_web-1-1140x760.jpg 1140w, \/wp-content\/uploads\/2022\/03\/20220209-_Schiffe-Angres-7_web-1.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-17763\" class=\"wp-caption-text\">Corvette \"K\u00f6ln\" of II Los K 130 in Hamburg before trials, photos. D. Angres<\/figcaption><\/figure>","protected":false},"excerpt":{"rendered":"<p>Mit der heutigen Kiellegung l\u00e4uft die Plattformfertigung der letzten von insgesamt f\u00fcnf neuen Korvetten der Klasse 130 f\u00fcr die Deutsche Marine auf Hochtouren. Pandemiebedingt erfolgte das feierliche Kiellegen auf der Peene-Werft im kleinsten Projektkreis im Beisein von Vertretern des Auftraggebers und der Patenstadt. Die neuen Korvetten werden unter Federf\u00fchrung der NVL Group (ehemals: L\u00fcrssen Defence) [&hellip;]<\/p>\n","protected":false},"author":16,"featured_media":17787,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_oasis_is_in_workflow":0,"_oasis_original":0,"_oasis_task_priority":"4urgent","footnotes":""},"categories":[49,486,42],"tags":[2771,193,2836,1809,293,1033,2838,388,2837,424,178],"class_list":["post-17754","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-schiffsbau-news","category-headlines","category-news","tag-boote","tag-bundeswehr","tag-deutschemarine","tag-german-naval-yards","tag-hamburg","tag-kiellegung","tag-klasse-130","tag-korvette","tag-nvl-group","tag-thyssenkrupp","tag-werften"],"acf":[],"_links":{"self":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/17754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/comments?post=17754"}],"version-history":[{"count":0,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/17754\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/media\/17787"}],"wp:attachment":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/media?parent=17754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/categories?post=17754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/tags?post=17754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}