{"id":21475,"date":"2022-07-27T15:00:00","date_gmt":"2022-07-27T13:00:00","guid":{"rendered":"https:\/\/marineforum.online\/?p=21475"},"modified":"2022-07-27T11:35:00","modified_gmt":"2022-07-27T09:35:00","slug":"nobiskrug-builds-superyacht","status":"publish","type":"post","link":"https:\/\/marineforum.online\/en\/nobiskrug-baut-superyacht\/","title":{"rendered":"Nobiskrug builds superyacht"},"content":{"rendered":"<p><strong>As announced at the beginning of July, Nobiskrug has signed a contract with Cecil Wright for the construction of an 80-metre superyacht<\/strong><\/p>\n<p>Together with Winch Design, the renowned Rendsburg shipyard and the well-known broker will work on the design and construction of an 80 metre superyacht with five decks. She should be ready for delivery at the pier in three years. This means there are four orders in the order book of Nobiskrug GmbH, whose yacht building division was taken over by Flensburger Schiffbaugesellschaft following its insolvency in 2021. Philipp Maracke, Managing Director of Nobiskrug, is also Managing Director of FSG, which is owned by investor Lars Windhorst.<\/p>\n<p>The market was considered successful until the outbreak of the Ukraine war, but whether and to what extent its development will affect the demand for yachts remains speculation for the time being.<\/p>\n<p>Nobiskrug is responsible for the entire production chain, while Cecil Wright is in charge of project management. The exterior of the ship and the interior were designed by the Winch Design studio in London. The yacht will have a beach club and spa area. The handover of the ship to the as yet undisclosed owner is planned for 2025.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Wie bereits Anfang Juli bekannt wurde, hat Nobiskrug einen Vertrag mit Cecil Wright \u00fcber den Bau einer 80-Meter-Superyacht unterzeichnet Gemeinsam mit Winch Design werden die renommierte Rendsburger Werft und der namhafte Broker an dem Entwurf und Bau einer 80 Meter langen Superyacht mit f\u00fcnf Decks arbeiten. In drei Jahren soll sie \u00fcbergabefertig an der Pier [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":21482,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_oasis_is_in_workflow":0,"_oasis_original":0,"_oasis_task_priority":"2normal","footnotes":""},"categories":[49,486,42,48],"tags":[4056,2733,4055,4058,2816,1384,4057],"class_list":["post-21475","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-schiffsbau-news","category-headlines","category-news","category-schifffahrt-news","tag-cecil-wright","tag-krieg","tag-nobiskrug","tag-rendsburger-werft","tag-superyacht","tag-ukraine","tag-winch-design"],"acf":[],"_links":{"self":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/21475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/comments?post=21475"}],"version-history":[{"count":0,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/21475\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/media\/21482"}],"wp:attachment":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/media?parent=21475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/categories?post=21475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/tags?post=21475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}