{"id":37843,"date":"2024-06-03T14:00:00","date_gmt":"2024-06-03T12:00:00","guid":{"rendered":"https:\/\/marineforum.online\/?p=37843"},"modified":"2025-09-29T21:06:20","modified_gmt":"2025-09-29T19:06:20","slug":"keel-laying-f-126","status":"publish","type":"post","link":"https:\/\/marineforum.online\/en\/kiellegung-f-126\/","title":{"rendered":"Keel laying F 126"},"content":{"rendered":"<h3><strong>Minister Pistorius present at the keel laying ceremony for the first frigate of class 126 \"Niedersachsen\"<br \/>\n<\/strong><\/h3>\n<p><strong>It is a \"M<\/strong><strong>milestone in the largest procurement project in the history of the German Navy\".<\/strong><\/p>\n<figure id=\"attachment_37848\" aria-describedby=\"caption-attachment-37848\" style=\"width: 310px\" class=\"wp-caption alignleft\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-37848\" src=\"\/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-3-u_mergener-e1717414103651-300x269.jpg\" alt=\"Keel laying of the first F126 - the cutlery. Photo Uwe Mergener\" width=\"310\" height=\"278\" srcset=\"\/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-3-u_mergener-e1717414103651-300x269.jpg 300w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-3-u_mergener-e1717414103651-1024x918.jpg 1024w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-3-u_mergener-e1717414103651-768x689.jpg 768w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-3-u_mergener-e1717414103651-1080x968.jpg 1080w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-3-u_mergener-e1717414103651-750x672.jpg 750w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-3-u_mergener-e1717414103651-1140x1022.jpg 1140w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-3-u_mergener-e1717414103651.jpg 1237w\" sizes=\"(max-width: 310px) 100vw, 310px\" \/><figcaption id=\"caption-attachment-37848\" class=\"wp-caption-text\">Keel laying of the first F126 - the cutlery. Photo: Uwe Mergener<\/figcaption><\/figure>\n<p>The keel of the first Class 126 frigate was laid today at the Peene shipyard in Wolgast in the presence of Federal Minister Boris Pistorius. The ship will one day be the new \"Niedersachsen\". That is why Minister President Weil was among the guests of honour. But according to old shipyard tradition, the name is not actually pronounced before the christening, because until then it is a \"construction number\".<\/p>\n<p>Six months after the start of construction at the Peene shipyard, the F126 project team can look back on a fulfilled schedule with the keel laying. It is the largest procurement project in the history of the German Navy. The construction contract comprises a total of four frigates of the new 126 class to date, and the prime contractor DAMEN and the Federal Office of Bundeswehr Equipment, Information Technology and In-Service Support (BAAINBw) have agreed an option for two further ships. We are still waiting for an official announcement of the decision. The ships will be built entirely in Germany.<\/p>\n<figure id=\"attachment_37846\" aria-describedby=\"caption-attachment-37846\" style=\"width: 300px\" class=\"wp-caption alignright\"><img decoding=\"async\" class=\"size-medium wp-image-37846\" src=\"\/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-1-u_mergener-e1717414212279-300x183.jpg\" alt=\"Keel laying of the first F126 - the mint. Photo: Uwe Mergener\" width=\"300\" height=\"183\" srcset=\"\/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-1-u_mergener-e1717414212279-300x183.jpg 300w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-1-u_mergener-e1717414212279-1024x625.jpg 1024w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-1-u_mergener-e1717414212279-768x468.jpg 768w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-1-u_mergener-e1717414212279-1080x659.jpg 1080w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-1-u_mergener-e1717414212279-750x457.jpg 750w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-1-u_mergener-e1717414212279-1140x695.jpg 1140w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-1-u_mergener-e1717414212279.jpg 1456w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-37846\" class=\"wp-caption-text\">Keel laying of the first F126 - the mint. Photo: Uwe Mergener<\/figcaption><\/figure>\n<p>In the coming months, work will begin in parallel at the German Naval Yards shipyard in Kiel, which is also involved in the project, and at the Blohm+Voss NVL site in Hamburg. The aft ships will be built in Wolgast, while the forecastles will be manufactured in Kiel and joined to the aft ships there. The ships are then shipped to Hamburg for final outfitting, commissioning and testing. Hundreds of suppliers throughout Germany are involved in the project.<\/p>\n<p>The frigate 126 will make a major contribution to Germany's NATO commitments. The F126 is to be deployable worldwide and will have a flexible and modular design. The F 126 is eagerly awaited by the navy, as the events in the Red Sea and before have shown how important the availability of units is.<\/p>\n<figure id=\"attachment_37907\" aria-describedby=\"caption-attachment-37907\" style=\"width: 388px\" class=\"wp-caption alignleft\"><img decoding=\"async\" class=\"wp-image-37907\" src=\"\/wp-content\/uploads\/2024\/06\/04-300x200.jpg\" alt=\"Keel laying of the first F126, photo:DAMEN\" width=\"388\" height=\"258\" srcset=\"\/wp-content\/uploads\/2024\/06\/04-300x200.jpg 300w, \/wp-content\/uploads\/2024\/06\/04-1024x683.jpg 1024w, \/wp-content\/uploads\/2024\/06\/04-768x512.jpg 768w, \/wp-content\/uploads\/2024\/06\/04-1080x720.jpg 1080w, \/wp-content\/uploads\/2024\/06\/04-750x500.jpg 750w, \/wp-content\/uploads\/2024\/06\/04-1140x760.jpg 1140w, \/wp-content\/uploads\/2024\/06\/04.jpg 1200w\" sizes=\"(max-width: 388px) 100vw, 388px\" \/><figcaption id=\"caption-attachment-37907\" class=\"wp-caption-text\">Keel laying of the first F126, photo:DAMEN<\/figcaption><\/figure>\n<p>The presence of the Federal Minister of Defence, Boris Pistorius, the Minister President of Mecklenburg-Western Pomerania, Manuela Schwesig, the Minister President of the eponymous federal state of Lower Saxony, Stephan Weil, and the naval inspector Jan Christian Kaack, underlines the enormous importance of the project for Germany, the German shipbuilding industry and the German Navy.<\/p>\n<div id='gallery-1' class='gallery galleryid-37843 gallery-columns-2 gallery-size-medium'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='\/wp-content\/uploads\/2024\/06\/01.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"\/wp-content\/uploads\/2024\/06\/01-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"Keel laying of the first F126, photo:DAMEN\" srcset=\"\/wp-content\/uploads\/2024\/06\/01-300x200.jpg 300w, \/wp-content\/uploads\/2024\/06\/01-1024x683.jpg 1024w, \/wp-content\/uploads\/2024\/06\/01-768x512.jpg 768w, \/wp-content\/uploads\/2024\/06\/01-1080x720.jpg 1080w, \/wp-content\/uploads\/2024\/06\/01-750x500.jpg 750w, \/wp-content\/uploads\/2024\/06\/01-1140x760.jpg 1140w, \/wp-content\/uploads\/2024\/06\/01.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='\/wp-content\/uploads\/2024\/06\/03.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"200\" src=\"\/wp-content\/uploads\/2024\/06\/03-300x200.jpg\" class=\"attachment-medium size-medium\" alt=\"Keel laying of the first F126, photo:DAMEN\" srcset=\"\/wp-content\/uploads\/2024\/06\/03-300x200.jpg 300w, \/wp-content\/uploads\/2024\/06\/03-1024x683.jpg 1024w, \/wp-content\/uploads\/2024\/06\/03-768x512.jpg 768w, \/wp-content\/uploads\/2024\/06\/03-1080x720.jpg 1080w, \/wp-content\/uploads\/2024\/06\/03-750x500.jpg 750w, \/wp-content\/uploads\/2024\/06\/03-1140x760.jpg 1140w, \/wp-content\/uploads\/2024\/06\/03.jpg 1200w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='\/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"188\" src=\"\/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253-300x188.jpg\" class=\"attachment-medium size-medium\" alt=\"Keel laying of the first F126 - first bottom section. Photo: Uwe Mergener\" srcset=\"\/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253-300x188.jpg 300w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253-1024x640.jpg 1024w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253-768x480.jpg 768w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253-1536x960.jpg 1536w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253-400x250.jpg 400w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253-1080x675.jpg 1080w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253-750x469.jpg 750w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253-1140x713.jpg 1140w, \/wp-content\/uploads\/2024\/06\/deu-f126_kiellegung-2-u_mergener-e1717414000253.jpg 1600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Minister Pistorius bei der Kiellegung der ersten Fregatte der\u00a0 Klasse 126 \u201eNiedersachsen\u201c anwesend Es ist ein \"Meilenstein im gr\u00f6\u00dften Beschaffungsprojekt in der Geschichte der Deutschen Marine\" heisst es. Auf der Peene-Werft in Wolgast fand heute im Beisein von Bundesminister Boris Pistorius die Kiellegung der ersten Fregatte der Klasse 126 statt. Das Schiff soll sp\u00e4ter einmal [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":37906,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_oasis_is_in_workflow":0,"_oasis_original":0,"_oasis_task_priority":"3high","footnotes":""},"categories":[49,486,42,51],"tags":[173,913,182,2098,338,7428,531,1033,7429,372,3138,2101,4676],"class_list":["post-37843","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-schiffsbau-news","category-headlines","category-news","category-streitkraefte-news","tag-blohmvoss","tag-damen","tag-deutsche-marine","tag-f126","tag-fregatte","tag-gny-kiel","tag-inspekteur-marine","tag-kiellegung","tag-kiellegung-f-126","tag-niedersachsen","tag-nvl","tag-peene-werft","tag-wolgast"],"acf":[],"_links":{"self":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/37843","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/comments?post=37843"}],"version-history":[{"count":1,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/37843\/revisions"}],"predecessor-version":[{"id":49652,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/37843\/revisions\/49652"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/media\/37906"}],"wp:attachment":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/media?parent=37843"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/categories?post=37843"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/tags?post=37843"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}