{"id":52645,"date":"2026-01-19T17:00:00","date_gmt":"2026-01-19T16:00:00","guid":{"rendered":"https:\/\/marineforum.online\/?p=52645"},"modified":"2026-01-19T15:45:05","modified_gmt":"2026-01-19T14:45:05","slug":"sigint-ship-poland-dolphin-programme","status":"publish","type":"post","link":"https:\/\/marineforum.online\/en\/sigint-schiff-polen-delfin-programm\/","title":{"rendered":"Poland: Christening of the second SIGINT ship in the dolphin programme"},"content":{"rendered":"<p>On 14 January 2026, \"Henryk Zygalski\", the second SIGINT reconnaissance ship for the Polish Navy, was launched in Gda\u0144sk in the presence of Deputy Minister of Defence Pawe\u0142 Bejda. The ship was named after a Polish mathematician and cryptologist who helped decipher the German Enigma code in the 1930s.<\/p>\n<figure id=\"attachment_52710\" aria-describedby=\"caption-attachment-52710\" style=\"width: 709px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-52710\" src=\"\/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-3-remontowa26-e1768828217575-300x121.jpeg\" alt=\"With powerful music - christening of the &quot;Hendryk Zygalski&quot;. Photo: Remontowa\" width=\"709\" height=\"286\" srcset=\"\/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-3-remontowa26-e1768828217575-300x121.jpeg 300w, \/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-3-remontowa26-e1768828217575-1024x414.jpeg 1024w, \/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-3-remontowa26-e1768828217575-768x310.jpeg 768w, \/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-3-remontowa26-e1768828217575-18x7.jpeg 18w, \/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-3-remontowa26-e1768828217575.jpeg 1460w\" sizes=\"(max-width: 709px) 100vw, 709px\" \/><figcaption id=\"caption-attachment-52710\" class=\"wp-caption-text\">With powerful music - christening of the \"Hendryk Zygalski\". Photo: Remontowa<\/figcaption><\/figure>\n<p>The main contractor for the two-unit Dolphin class is the Swedish defence company Saab, which is responsible for system design, mission systems and overall integration. The ship design comes from MMC Ship Design &amp; Marine Consulting, a ship design office based in Gdynia - MMC was also involved in the development of the Swedish SIGINT platform HSwMS \"Artemis\". The ships were built at the Remontowa shipyard in Gda\u0144sk.<\/p>\n<figure id=\"attachment_52715\" aria-describedby=\"caption-attachment-52715\" style=\"width: 300px\" class=\"wp-caption alignleft\"><img decoding=\"async\" class=\"size-medium wp-image-52715\" src=\"\/wp-content\/uploads\/2026\/01\/swe-aux-a202-agi-artemis-saab23-300x168.jpg\" alt=\"Swedish reconnaissance ship HSwNS &quot;Artemis&quot;. Photo: Saab\" width=\"300\" height=\"168\" srcset=\"\/wp-content\/uploads\/2026\/01\/swe-aux-a202-agi-artemis-saab23-300x168.jpg 300w, \/wp-content\/uploads\/2026\/01\/swe-aux-a202-agi-artemis-saab23-1024x575.jpg 1024w, \/wp-content\/uploads\/2026\/01\/swe-aux-a202-agi-artemis-saab23-768x431.jpg 768w, \/wp-content\/uploads\/2026\/01\/swe-aux-a202-agi-artemis-saab23-1536x862.jpg 1536w, \/wp-content\/uploads\/2026\/01\/swe-aux-a202-agi-artemis-saab23-18x10.jpg 18w, \/wp-content\/uploads\/2026\/01\/swe-aux-a202-agi-artemis-saab23.jpg 1700w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-52715\" class=\"wp-caption-text\">Swedish reconnaissance ship HSwNS \"Artemis\". Photo: Saab<\/figcaption><\/figure>\n<p>The two Delfin ships will replace the outdated Modified Moma class reconnaissance vessels from the 1970s and mark a qualitative leap in maritime reconnaissance capability, not only for Poland, but for the entire Baltic Sea region. With comprehensive ELINT\/COMINT functionality, they are designed to detect maritime electronic signals across a broad spectrum.<\/p>\n<p>The first unit, the \"Jerzy R\u00f3\u017cycki\", was already launched in July 2025. Equipment, integration of the mission systems and sea trials are now planned for both units. Delivery is scheduled for 2027-28. Details on the units are scarce.<\/p>\n<figure id=\"attachment_52709\" aria-describedby=\"caption-attachment-52709\" style=\"width: 413px\" class=\"wp-caption alignright\"><img decoding=\"async\" class=\"wp-image-52709\" src=\"\/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-2-remontowa26-e1768828274183-300x165.jpeg\" alt=\"&quot;Hendryk Zygalski&quot;. On the right, the bow of the 50-year-old &quot;Hydrograf&quot; (Mod-Moma class). Photo: Remontowa\" width=\"413\" height=\"227\" srcset=\"\/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-2-remontowa26-e1768828274183-300x165.jpeg 300w, \/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-2-remontowa26-e1768828274183-1024x563.jpeg 1024w, \/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-2-remontowa26-e1768828274183-768x422.jpeg 768w, \/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-2-remontowa26-e1768828274183-18x10.jpeg 18w, \/wp-content\/uploads\/2026\/01\/pol-aux-agi-delfin-264-hendryk_zygalski-2-remontowa26-e1768828274183.jpeg 1200w\" sizes=\"(max-width: 413px) 100vw, 413px\" \/><figcaption id=\"caption-attachment-52709\" class=\"wp-caption-text\">\"Hendryk Zygalski\". On the right, the bow of the 50-year-old \"Hydrograf\" (Mod-Moma class). Photo: Remontowa<\/figcaption><\/figure>\n<p>Strategically, the expansion of SIGINT capacities is an important contribution to situational awareness in the Baltic Sea region. Neither Saab nor the Polish authorities are providing any further details on the specific electronic reconnaissance systems on board the Dolphin class. However, the direction of travel is clear: Poland is building up a specific maritime ELINT\/COMINT capability and strengthening its role in the allied ISR network in the increasingly contested Baltic Sea region.<\/p>\n<p>hum, ajs<\/p>","protected":false},"excerpt":{"rendered":"<p>Am 14. Januar 2026 lief in Gda\u0144sk \u201eHenryk Zygalski\u201c, das zweite SIGINT-Aufkl\u00e4rungsschiff f\u00fcr die polnische Marine, im Beisein des stellvertretenden Verteidigungsministers Pawe\u0142 Bejda vom Stapel. Zuvor erhielt das Schiff seinen Namen nach einem polnischen Mathematiker und Kryptologen, der in den 1930er Jahren zur Entschl\u00fcsselung des deutschen Enigma-Codes beitrug. Hauptauftragnehmer f\u00fcr die zwei Einheiten umfassende Delfin-Klasse [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":52722,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_oasis_is_in_workflow":0,"_oasis_original":0,"_oasis_task_priority":"2normal","footnotes":""},"categories":[45,42,49,51],"tags":[3805,3845,11675,3844,11720,10675,11717,11723,11721,196,11716,361,360,11722,5956,11719,258,8917,9376,11718],"class_list":["post-52645","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-marinen-aus-aller-welt-news","category-news","category-schiffsbau-news","category-streitkraefte-news","tag-aufklaerungsschiff","tag-comint","tag-delfin-klasse","tag-elint","tag-gdansk","tag-isr","tag-isr-verbund","tag-mmc-ship-design","tag-moma-klasse","tag-ostsee","tag-ostsee-aufklaerung","tag-polen","tag-polnische-marine","tag-remontowa","tag-remontowa-shipbuilding","tag-rozycki","tag-saab","tag-sigint","tag-sigint-marine","tag-zygalski"],"acf":[],"_links":{"self":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/52645","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/comments?post=52645"}],"version-history":[{"count":7,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/52645\/revisions"}],"predecessor-version":[{"id":52721,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/posts\/52645\/revisions\/52721"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/media\/52722"}],"wp:attachment":[{"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/media?parent=52645"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/categories?post=52645"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/marineforum.online\/en\/wp-json\/wp\/v2\/tags?post=52645"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}