Category: Headlines

Celebration to mark 66 years of the Bundeswehr

From office to ministry... On 12 November 1955, the Bundeswehr was born with the handover of 101 certificates of appointment to the volunteers of the army, air force and navy. The then Minister of Defence, Theodor Blank, began preparations for the rearmament of the young Federal Republic of Germany in 1950 in the Blank Office with other members of the Himmerode Group of Experts. The Himmerode Memorandum is regarded as the basis from which ideas and the "Innere Führung" leadership concept for the formation of the Bundeswehr were taken and implemented. The Bundeswehr celebrated the 66th anniversary of its founding with several events throughout Germany. In Rostock city harbour, the air force presented itself alongside the "Patriot" air defence missile system...

Weiterlesen

Helicopter drones for the navy's corvettes

From a press release issued by the Federal Office of Bundeswehr Equipment, Information Technology and In-Service Support (BAAINBw) in Koblenz The BAAINBw has concluded a contract with Elektroniksystem und Logistik GmbH (ESG) for the delivery of three "Sea Falcon" unmanned rotary-wing aircraft systems. The systems, whose main components each consist of two Skeldar V-200 aircraft and a ground control station, will be fully integrated into the K130 class corvettes. Modern reconnaissance tool for the navy The system enables the corvettes to reconnoitre and identify sea targets beyond the range of the on-board optical sensors. Due to its low optical and acoustic signature - especially when flying at night -...

Weiterlesen

The frigate 126 floats

The construction contract for the Class 126 was signed with Damen just a few weeks ago. The first tests have now been carried out on the frigate model in the test channel. Immediately following the parliamentary referral on 17 June 2020, the Class 126 frigate project reached the most important milestone in its realisation to date: the conclusion of the construction contract with Damen Schelde Naval Shipbuilding on 19 June 2020. In the first year after the contract was concluded, the so-called simulation phase was completed, which focused on eliminating scope for interpretation in the construction specification. In addition, further work was started as part of the basic engineering phase, including the layout of the rooms in the ship and the...

Weiterlesen

Charity run: Sea battalion collects donations for a children's home in Lebanon 

From a press release by Rostock Naval Command. On Friday, 12 November 2021, the naval battalion will be holding a 12 km charity run at its Eckernförde and Alt Duvenstedt locations between 8 and 10 am. The aim of the fundraising is to support the 48th German contingent in Lebanon in its charitable work on site for the "Mosan Centre for Special Needs". Commander Frigate Captain Norman Bronsch (40) describes it as follows: "After the long cuts caused by the COVID-19 pandemic, my aim is to bring the men and women of the sea battalion closer together again by overcoming challenges together. And to do something good in the process...

Weiterlesen
en_GBEnglish